New York State Public Service Commission

The following is a link to the New York State Public Service Commission’s website on the Standardized Interconnection Requirements: New York State Standardized Interconnection Requirements (NYSSIR)

Application Package Checklist (Appendix F of the NYSSIR)

  • Complete standard application form (Appendixes B & C)
  • New York State Standardized Acknowledgement of Property Owner Consent Form – For Systems above 50 kW up to 5 MW Only (Appendix H)
  • For residential systems rated 50 kW and below, a signed copy of the standard contract (Appendix A)
  • Letter of authorization, signed by the Customer, to provide for the contractor to act as the customer’s agent, if necessary
  • If requesting a new service, a site plan with the proposed interconnection point identified by a Google Earth, Bing Maps, or similar satellite image. For those projects on existing services, account and meter numbers shall be provided
  • Description / Narrative of the project and site proposed. If multiple DG systems are being proposed at the same site/location, this information needs to be identified and explained in detail
  • DG technology type
  • DG fuel source / configuration
  • Proposed project size in AC kW
  • Project is net metered, remote, or community net metered
  • Metering configuration
  • Copy of the certificate of compliance referencing UL 1741
  • Copy of the manufacturer’s data sheet for the interface equipment
  • Copy of the manufacturer’s verification test procedures, if required
  • System Diagram – A three-line diagram for designs proposed on three phase systems, including detailed information on the wiring configuration at the PCC and an exact representation of existing utility service. One-line diagram shall be accepted for single phase installations

Sample Inverter-Based System Verification Test Procedure Templates

Solar PV Inverter-Based System Verification Test Procedure Template
Solar PV Microinverter-Based System Verification Test Procedure Template
3-Phase Solar PV Inverter-Based System Verification Test Procedure Template
Wind Inverter-Based System Verification Test Procedure Template